r/ISRO • • 22h ago

Got selected for ISRO ISTRAC Graduate Apprenticeship (ECE) in Bengaluru. Is it worth joining for core electronics / future career?

5 Upvotes

Hi everyone,

I recently completed my B.Tech in Electronics & Communication Engineering (2026 graduate) and have received an offer for the Graduate Apprenticeship Training (1 year) at ISRO ISTRAC, Peenya, Bengaluru with a monthly stipend of ₹12,300.

Before committing and relocating, I would really appreciate honest advice from anyone who has done an apprenticeship at ISTRAC/ISRO centers or works in core electronics:

  1. Work Quality & Learning: For an ECE graduate at ISTRAC, what does the day-to-day work look like? Do you get hands-on experience in telemetry, RF, PCB testing, or ground systems, or is it mostly passive documentation and administrative tasks?
  2. Career Impact: Does holding an ISRO apprenticeship certificate carry strong weight when applying to private core electronics, aerospace, or defense firms afterward? Or does the industry count it merely as an extended internship rather than full-time relevant experience?
  3. Work-Life Balance & Exam Prep: Are the working hours fixed (strict 9 to 5, weekends off)?Any genuine feedback on whether it’s better to take this or go straight into an entry-level private industry role would help me make the right decision. Thanks!

r/ISRO • • 3h ago

30 Oct, 18:21(UTC)/23:51(IST) GSLV-F18 / NVS-03 Mission Updates and Discussion

7 Upvotes

GSLV-F18 / NVS-03 (aka IRNSS-1L) launch is scheduled at 18:21:00(UTC)/23:51:00(IST), 30 Oct 2026 from Second Launch Pad of SDSC-SHAR.

Live webcast: (Links will be added as they become available)

GSLV-F18 / NVS-03 Mission Page GSLV-F18 / NVS-03 Gallery GSLV-F18 / NVS-03 Press kit(PDF)

Some highlights:

Updates:

Time of Event Update
26 Oct 2026 Time of launch officially confirmed for 11:51 (IST), 30 Oct 2026
23 Oct 2026 NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 30 October 2026
29 Sep 2026 NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 13 October 2026.
14 Sep 2026 GSLV-F18 / NVS-03 launch campaign began.

Primary Payload:

NVS-03 (aka IRNSS-1L) (~2250 kg) : NVS-03 is a second-generation satellite for NavIC constellation for regional navigation and timing services.

Similar to first generation satellites it will have navigation payloads in L5 & S bands and ranging payload in C-band. But additionally, it will have a new interoperable civil signal in L1 band as well.[1] [2]

Like NVS-01 and NVS-02 it is expected to carry only one indigenous Rubidium based atomic clock (iRAFS) developed by Space Applications Centre (SAC) out of four in total. [3] [4] [5]

  • Mass: 2,250 kg
  • Orbital slot: <To be added later>
  • Mission life: 12 years
  • Power: ~3 kW
  • Platform/Bus: I-2K

NVS-03 is third of the five satellites (NVS-01, 02, 03, 04 & 05) planned to replace the aging first generation satellites that faced problems with their malfunctioning atomic clocks. Initially these second generation satellites were meant to expand upon existing NaVIC constellation [6] [7] but due to setback from failures of imported clocks on many first generation satellites, they will now only serve as replacement to existing fleet. At present only three out of eight NavIC satellites (IRNSS-1B, 1I and NVS-01) remain functional to provide PNT services. [8] Note that four satellites is the minimum amount needed for NavIC PNT services to be functional.

ISRO has sought approval of three more navigation satellites under NavIC Phase-3 to maintain the base layer of seven satellites. Eventually NavIC constellation can be expanded from 7 to 11 satellites which will increase the service area from 1500 km to 3000 km beyond Indian territory.

For Global Indian Navigation System (GINS), ISRO is awaiting approval of twelve satellites initially to be placed in the Medium Earth Orbit (MEO). While about 24 to 30 satellites would be needed in total. [9] [10]


r/ISRO • • 3h ago

GSLV F18/NVS03 mission page is up

21 Upvotes