r/ISRO • • Aug 31 '26

Mission Success! GSLV-F17 / EOS-05 (aka GISAT-1A) Mission Updates and Discussion

33 Upvotes

GSLV-F17 / EOS-05 (aka GISAT-1A) launched as scheduled at 21:25(UTC), 03 Sep 2026 or 02:55(IST), 04 Sep 2026 from Second Launch Pad of SDSC-SHAR.

Live webcast: (Links will be added as they become available)

GSLV-F17 / EOS-05 Mission Page GSLV-F17 / EOS-05 Gallery GSLV-F17 / EOS-05 Press kit(PDF)

Some highlights:

  • Primary payload: EOS-05 (aka GISAT-1A) (~2367 kg) GSO based Earth imaging satellite.
  • Mission duration: ~19 minutes (based on GSLV F10/EOS-3 (aka GISAT-1) mission)
  • Target Orbit : 170 × 28934 km (sub-GTO) , Inclination = 19.28° ± 0.1°, AoP = 178° ± 0.5°
  • Launch Azimuth: 104°
  • ISRO returning to flight 7 months 23 days after failure of PSLV-C62/EOS-N1.

Updates:

Time of Event Update
30 Sep 2026 EOS-05 has reached at its 85.5°E slot and is station keeping.
Post-launch Third and final orbit raising burn by EOS-05 or GISAT-1A for duration of 1247 seconds has been successfully completed on 7 Sept 2026 at 20:57 hrs (IST). Estimated orbit 35884 x 34903 km. The satellite health is normal.
Post-launch Second orbit raising burn by EOS-05 or GISAT-1A for duration of 338.9 seconds has been successfully completed on 6 Sept 2026 at 19:00 hrs (IST). Estimated apogee after manouever is 35786 km. The satellite health is normal.
Post-launch First orbit raising burn by EOS-05 or GISAT-1A for duration of 5406.4 seconds has been successfully completed on 5 Sept 2026 at 20:19 hrs (IST). New orbit with raised perigee is 31129×20000 km from previous 31121×171 km.
Post-launch Two objects have been catalogued. A0607 (26202A) with inclination=19.32°, Apogee×Perigee=30967.1×152.4 km and A0608 (26202B) with inclination=19.34°, Apogee×Perigee=30982.9×159.3 km
T + 24m10s Chairman notes that Solar panels of satellite are deployed
T + 22m40s ISRO chairman notes satellite has been placed in intended orbit.
T + 18m45s EOS-05 separated!!
T + 18m30s CUS15 cut off!
T + 15m46s CUS15 performance nominal.
T + 14m00s CUS15 performance nominal.
T + 12m26s CUS15 now in nominal thrust mode.
T + 12m00s Vehicle is precisely on expected trajectory.
T + 11m00s CUS15 performance nominal.
T + 07m30s CUS15 performance nominal. Right on expected track.
T + 05m40s CUS15 operating in uprated mode.
T + 05m05s GS2 cut off, CUS15 ignition confirmed!
T + 03m56s PLF jettisoned!
T + 02m32s GS1 ignited, GS1 separated, CLG inititiated.
T + 01m50s S139 Burnt out.
T - Zero! S139 ignition Lift off!
T - 00m4.8s 4xL40H ignition
T - 03m20s OBC in flight mode.
T - 05m00s Vehicle is on internal power. Flight coeff. loading completed.
T - 10m00s Going through GS2 actuation checks.
T - 15m00s ALS initiated.
T - 16m00s VD: Automatic Launch Sequence authorized.
T - 18m00s Mission Director has authorized the launch after polling is Go!
T - 22m00s Polling now. Range, Tracking, Vehicle are ready.
T - 30m00s Streams are live!
T - 27h30m A 27.5 hr duration countdown should be underway.
01 Sep 2026 After Mission Readiness Review or MRR, Launch Authorization Board has given the launch clearance.
31 Aug 2026 Time of launch officially confirmed for 02:55 (IST), 04 Sep 2026.
28 Aug 2026 Launch Vehicle transferred from VAB to SLP.
27 Aug 2026 NOTAM for GSLV-F17 / EOS-05 launch is issued with enforcement window beginning on 03 Sep 2026.
23 Jul 2026 FCC filings for Launch and Early Orbit Phase services for EOS-05. (24 July to 22 August 2026)
11 May 2026 FCC filings for Launch and Early Orbit Phase services for EOS-05. (12 May to 10 June 2026)
01 Apr 2026 FCC filings for Launch and Early Orbit Phase services for EOS-05. (1 to 30 April 2026)
07 May 2026 NOTAM for GSLV-F17 / EOS-05 launch is issued with enforcement window beginning on 21 May 2026.
29 Apr 2026 News reports suggest technical issues with Launch Vehicle hardware delay the launch.
26 Feb 2026 FCC filings for Launch and Early Orbit Phase services for EOS-05. (27 Feb to 2 April 2026)
12 Feb 2026 NOTAM for GSLV-F17 / EOS-05 launch is issued with enforcement window beginning on 6 March 2026.
03 Feb 2026 NOTAM for GSLV-F17 / EOS-05 launch is issued with enforcement window beginning on 20 February 2026.

Primary Payload:

EOS-05 (aka GISAT-1A) (~2367 kg) : EOS-05 is a GSO based Earth imaging satellite for Indian Navy, it will act as an upgraded replacement for EOS-03 or GISAT-1 which was lost during its launch five years ago. Its multispectral and hyperspectral imaging capacity will be useful for applications in fields of agriculture, forestry, mineralogy, oceanography and military surveillance. Its near real time imaging modes are well suited for monitoring natural disasters and other episodic events.

Specifications: [1] [2]

  • MX-VNIR: Multispectral - Visible Near Infrared

    • 6 channels (0.45 to 0.875 µm) at 42 meter spatial resolution
  • HyS-VNIR: Hyperspectral Imager - Visible Near Infrared

    • 158 channels (0.375 to 1.0 µm) at 320 meter spatial resolution
  • HyS-SWIR: Hyperspectral Imager - Short Wave Infrared

    • 256 channels (0.9 to 2.5 µm) at 190 meter spatial resolution
  • MX-LWIR: Multispectral - Long Wave Infrared

    • 6 channels (7.0 to 13.5 µm) at 1.2 km spatial resolution
  • Scan modes

    • 5°×5° (3000×3000 km) every 10 minutes
    • 3×10°×10° every 6 hours
  • Platform/Bus: I-2K

  • Mission life : 7 years

  • Orbital slot: 85.5°E


r/ISRO • • 1h ago

30 Oct, 18:21(UTC)/23:51(IST) GSLV-F18 / NVS-03 Mission Updates and Discussion

• Upvotes

GSLV-F18 / NVS-03 (aka IRNSS-1L) launch is scheduled at 18:21:00(UTC)/23:51:00(IST), 30 Oct 2026 from Second Launch Pad of SDSC-SHAR.

Live webcast: (Links will be added as they become available)

GSLV-F18 / NVS-03 Mission Page GSLV-F18 / NVS-03 Gallery GSLV-F18 / NVS-03 Press kit(PDF)

Some highlights:

Updates:

Time of Event Update
26 Oct 2026 Time of launch officially confirmed for 11:51 (IST), 30 Oct 2026
23 Oct 2026 NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 30 October 2026
29 Sep 2026 NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 13 October 2026.
14 Sep 2026 GSLV-F18 / NVS-03 launch campaign began.

Primary Payload:

NVS-03 (aka IRNSS-1L) (~2250 kg) : NVS-03 is a second-generation satellite for NavIC constellation for regional navigation and timing services.

Similar to first generation satellites it will have navigation payloads in L5 & S bands and ranging payload in C-band. But additionally, it will have a new interoperable civil signal in L1 band as well.[1] [2]

Like NVS-01 and NVS-02 it is expected to carry only one indigenous Rubidium based atomic clock (iRAFS) developed by Space Applications Centre (SAC) out of four in total. [3] [4] [5]

  • Mass: 2,250 kg
  • Orbital slot: <To be added later>
  • Mission life: 12 years
  • Power: ~3 kW
  • Platform/Bus: I-2K

NVS-03 is third of the five satellites (NVS-01, 02, 03, 04 & 05) planned to replace the aging first generation satellites that faced problems with their malfunctioning atomic clocks. Initially these second generation satellites were meant to expand upon existing NaVIC constellation [6] [7] but due to setback from failures of imported clocks on many first generation satellites, they will now only serve as replacement to existing fleet. At present only three out of eight NavIC satellites (IRNSS-1B, 1I and NVS-01) remain functional to provide PNT services. [8] Note that four satellites is the minimum amount needed for NavIC PNT services to be functional.

ISRO has sought approval of three more navigation satellites under NavIC Phase-3 to maintain the base layer of seven satellites. Eventually NavIC constellation can be expanded from 7 to 11 satellites which will increase the service area from 1500 km to 3000 km beyond Indian territory.

For Global Indian Navigation System (GINS), ISRO is awaiting approval of twelve satellites initially to be placed in the Medium Earth Orbit (MEO). While about 24 to 30 satellites would be needed in total. [9] [10]


r/ISRO • • 1h ago

GSLV F18/NVS03 mission page is up

14 Upvotes

r/ISRO • • 1d ago

NVS-03 to fly with pyro valves open as ISRO seeks to avert repeat failure

Thumbnail thefederal.com
40 Upvotes

r/ISRO • • 20h ago

Got selected for ISRO ISTRAC Graduate Apprenticeship (ECE) in Bengaluru. Is it worth joining for core electronics / future career?

5 Upvotes

Hi everyone,

I recently completed my B.Tech in Electronics & Communication Engineering (2026 graduate) and have received an offer for the Graduate Apprenticeship Training (1 year) at ISRO ISTRAC, Peenya, Bengaluru with a monthly stipend of ₹12,300.

Before committing and relocating, I would really appreciate honest advice from anyone who has done an apprenticeship at ISTRAC/ISRO centers or works in core electronics:

  1. Work Quality & Learning: For an ECE graduate at ISTRAC, what does the day-to-day work look like? Do you get hands-on experience in telemetry, RF, PCB testing, or ground systems, or is it mostly passive documentation and administrative tasks?
  2. Career Impact: Does holding an ISRO apprenticeship certificate carry strong weight when applying to private core electronics, aerospace, or defense firms afterward? Or does the industry count it merely as an extended internship rather than full-time relevant experience?
  3. Work-Life Balance & Exam Prep: Are the working hours fixed (strict 9 to 5, weekends off)?Any genuine feedback on whether it’s better to take this or go straight into an entry-level private industry role would help me make the right decision. Thanks!

r/ISRO • • 2d ago

Official GSLV-F18 / NVS-03 : Registration for Launch View Gallery to open at 18:00 IST today (26 October 2026). Launch scheduled on 30 October 2026 at 23:51 (IST)

Thumbnail lvg.shar.gov.in
33 Upvotes

r/ISRO • • 3d ago

ISRO to have four launch pads by 2029, says Narayanan

Thumbnail
thehindu.com
141 Upvotes

r/ISRO • • 3d ago

ISRO Scientist/Engineer ‘SC’ Interview Experience | ICRB 2025 | CSE

87 Upvotes

Branch: Computer Science & IT

Interview Duration: Approximately 30 minutes

Interview Panel: Around 9–10 members

Interview Experience

Initially, I was a little nervous seeing a panel of around 9–10 members, but after a while, I became more comfortable. The interview lasted approximately 30 minutes.

The panel asked questions from various core CS subjects, Machine Learning, Embedded Systems, Cyber Security, C Programming, and my work experience at IMD.

Questions Asked

  1. Computer Networks

- What is a Network Operating System?

- Router and Virtual Router

- Routing Protocols

- RIP and OSPF

- Ethernet and Ethernet Header Length

- VLAN

  1. Machine Learning

- Logistic Regression

- Sigmoid and Softmax Functions

- MSE in Logistic Regression

- SVM and Kernel Trick

- Naive Bayes and why it is called Naive Bayes

- Entropy and Information Gain

  1. Computer Architecture

- Instruction Pipeline and Pipelining

- Superscalar Processor

- RISC vs CISC

- Data Hazards

- RAW, WAR, and WAW Dependencies

- Solutions to Data Hazards

- True and False Dependencies

- Branch Prediction

  1. Embedded Systems

- Embedded System

- Microcontroller

- SATA (Serial Advanced Technology Attachment)

- GPRS in a Data Logger

  1. Cyber Security

- ISO Standards for Cyber Security

- CIA Triad

- Non-Repudiation

- EFD in Cyber Security

  1. C Programming

- Basic definition of C programming and whether the definition was valid

- Structure in C

- One short-form question that I could not recall afterward

  1. Questions Related to My IMD Work Experience

- Functionality of AWS and ARG

- IMD Forecast Resolution

These are the questions I could recall from my interview.

Final Verdict : Selected.

Posting Location: IPRC Mahendragiri, Tamil Nadu. 🚀


r/ISRO • • 3d ago

Question on liftoff times

11 Upvotes

Optical imaging earth observation satellites are generally launched from SHAR between 9am-12noon to sun-synchronous polar orbits. This I understand is to align equator crossings at same local solar time everyday and ensure consistent lighting.

SAR imaging EO satellites are generally launched around 6am in the morning to dawn-to-dusk SSPO orbits. This is to ensure constant illumination of satellite's solar panel and hence maximise power generation.

But satellites launched to GTO/Sub-GTO do not have such constraints. For instance, IRNSS/NAVIC family satellite liftoff times are all over -- 1am, 9am, 5pm, 10pm etc. So what factors determine their liftoff times? Is it MCF visibility during LAM firing? range clearance?


r/ISRO • • 4d ago

Urgent guidance on SDSC SHAR

11 Upvotes

Can anyone enlighten me about how work culture is at sdsc shar as recruitment notice has come up. I know less vacancies and that is why I'm getting second thoughts cause 6y ago someone actually spoke negatively idk what to trust and what not. Even nobody has ever interviewed for sdsc shar. Is is really that bad centre?

Please enlighten me about the work culture, about the living, outside centre or inside campus how it works and goes 🙏🏻


r/ISRO • • 5d ago

Official SPADEX Satellites Re-entry into Earth’s Atmosphere on October 12, 2026 [Official press release]

Thumbnail isro.gov.in
28 Upvotes

r/ISRO • • 5d ago

Official NSIL Signs Contract with Indian Air Force (IAF) for production of GSAT-7C Communication Satellite

Thumbnail nsilindia.co.in
27 Upvotes

r/ISRO • • 5d ago

NOTAM NOTAM for GSLV-F18 / NVS-03 launch is out. Enforcement duration 1700-2100 (UTC), 30 Oct to 11 Nov 2026.

29 Upvotes

Source: https://www.notams.faa.gov/

Mapped up!


A3241/26

GSLV-F18 ROCKET LAUNCH FM SHAR RANGE, SRIHARIKOTA WILL TAKE 
PLACE AS PER FLW DETAILS.THE LAUNCH WILL BE ON ANY ONE 
OF THE DAY DRG THIS PERIOD.ACTUAL DATE OF LAUNCH WILL BE 
INTIMATED ATLEAST 24 HR IN ADVANCE THROUGH A SEPARATE NOTAM. 

LAUNCH PAD COORD: 134312N0801348E 
NO FLT IS PERMITTED OVER THE DNG ZONES. 

1. DNG ZONE-1: IS A CIRCLE OF 10NM AROUND THE LAUNCHER. 

2. DNG ZONE-2: IS AN AREA BOUNDED BY FLW COORD: 
1200N 08445E - 1245N 08500E - 1220N 08620E - 
1135N 08605E - 1200N 08445E 

3. DNG ZONE-3: IS AN AREA BOUNDED BY FLW COORD: 
1055N 08750E - 1155N 08800E - 1105N 09030E - 
1005N 09020E - 1055N 08750E 

RTE AFFECTED IN CHENNAI FIR: 
W20, Q11, Q23, Q24, V4, V9, P761, P762, N877, N571 

CLOSURES/ALTN RTE FOR OVERFLYING: 

1. W20 NOT AVBL BTN MMV-KAMGU 
 ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU 

2. Q24 NOT AVBL BTN MMV-KAMGU 
 ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU 

3. Q23 NOT AVBL BTN RINTO-MMV 
 ALTN: RINTO-V11-TTP-DCT-GUANI-DCT-MMV 

4. V4 NOT AVBL BTN BOPRI-MMV 
 ALTN: BOPRI-DCT-RINTO-V11-TTP-DCT-GUANI-DCT-MMV 

5. V9 NOT AVBL BTN GUNRI-MMV 
 ALTN: GUNRI-V11-TTP-DCT-GUANI-DCT-MMV 

6. Q11 NOT AVBL BTN GURAS-MMV 
 ALTN: GURAS-DCT-MMV 

7. P761 NOT AVBL BTN IDASO-DUMAR 
 ALTN: IDASO-DCT-EGOLU-L518-DUMAR 

8. P762 NOT AVBL BTN BIKEN-NIMOV. NO ALTN RTE 

9. N877 N OT AVBL BTN DUMAR-AGEGA 
 ALTN: DUMAR-P761-LEGIN-L510 

10.N571 NOT AVBL BTN IDASO-BIKEN 
 ALTN: VATMO-DCT-GIRNA-BIKEN 

DEP FM CHENNAI MAY FPL AS FLW: 

1. W20/Q24 NOT AVBL BTN MMV-KAMGU 
 ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU 

ARR TO CHENNAI MAY FPL AS FLW: 

1. Q23 NOT AVBL BTN RINTO-MMV 

 ALTN: RINTO-V11-TTP-DCT-GUANI-DCT-MMV 

2. V4 NOT AVBL BTN BOPRI-MMV 
 ALTN: BOPRI-DCT-RINTO-V11-TTP-DCT-GUANI-DCT-MMV 

3. V9 NOT AVBL BTN GUNRI-MMV 
 ALTN: GUNRI-V11-TTP-DCT- GUANI-DCT-MMV 

4. Q11 NOT AVBL BTN GURAS-MMV 
 ALTN: GURAS-DCT-MMV
GSLV-F18 ROCKET LAUNCH FM SHAR RANGE, SRIHARIKOTA WILL TAKE 
PLACE AS PER FLW DETAILS.THE LAUNCH WILL BE ON ANY ONE 
OF THE DAY DRG THIS PERIOD.ACTUAL DATE OF LAUNCH WILL BE 
INTIMATED ATLEAST 24 HR IN ADVANCE THROUGH A SEPARATE NOTAM. 

LAUNCH PAD COORD: 134312N0801348E 
NO FLT IS PERMITTED OVER THE DNG ZONES. 

1. DNG ZONE-1: IS A CIRCLE OF 10NM AROUND THE LAUNCHER. 

2. DNG ZONE-2: IS AN AREA BOUNDED BY FLW COORD: 
1200N 08445E - 1245N 08500E - 1220N 08620E - 
1135N 08605E - 1200N 08445E 

3. DNG ZONE-3: IS AN AREA BOUNDED BY FLW COORD: 
1055N 08750E - 1155N 08800E - 1105N 09030E - 
1005N 09020E - 1055N 08750E 

RTE AFFECTED IN CHENNAI FIR: 
W20, Q11, Q23, Q24, V4, V9, P761, P762, N877, N571 

CLOSURES/ALTN RTE FOR OVERFLYING: 

1. W20 NOT AVBL BTN MMV-KAMGU 
 ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU 

2. Q24 NOT AVBL BTN MMV-KAMGU 
 ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU 

3. Q23 NOT AVBL BTN RINTO-MMV 
 ALTN: RINTO-V11-TTP-DCT-GUANI-DCT-MMV 

4. V4 NOT AVBL BTN BOPRI-MMV 
 ALTN: BOPRI-DCT-RINTO-V11-TTP-DCT-GUANI-DCT-MMV 

5. V9 NOT AVBL BTN GUNRI-MMV 
 ALTN: GUNRI-V11-TTP-DCT-GUANI-DCT-MMV 

6. Q11 NOT AVBL BTN GURAS-MMV 
 ALTN: GURAS-DCT-MMV 

7. P761 NOT AVBL BTN IDASO-DUMAR 
 ALTN: IDASO-DCT-EGOLU-L518-DUMAR 

8. P762 NOT AVBL BTN BIKEN-NIMOV. NO ALTN RTE 

9. N877 N OT AVBL BTN DUMAR-AGEGA 
 ALTN: DUMAR-P761-LEGIN-L510 

10.N571 NOT AVBL BTN IDASO-BIKEN 
 ALTN: VATMO-DCT-GIRNA-BIKEN 

DEP FM CHENNAI MAY FPL AS FLW: 

1. W20/Q24 NOT AVBL BTN MMV-KAMGU 
 ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU 

ARR TO CHENNAI MAY FPL AS FLW: 

1. Q23 NOT AVBL BTN RINTO-MMV 

 ALTN: RINTO-V11-TTP-DCT-GUANI-DCT-MMV 

2. V4 NOT AVBL BTN BOPRI-MMV 
 ALTN: BOPRI-DCT-RINTO-V11-TTP-DCT-GUANI-DCT-MMV 

3. V9 NOT AVBL BTN GUNRI-MMV 
 ALTN: GUNRI-V11-TTP-DCT- GUANI-DCT-MMV 

4. Q11 NOT AVBL BTN GURAS-MMV 
 ALTN: GURAS-DCT-MMV. GND - UNL, 1700-2100, 30 OCT 17:00 2026 UNTIL 11 NOV
21:00 2026. CREATED: 23 OCT 05:41 2026

Edit (26 Oct 2026): Adding remaining hazard zones (WMFC)

A4225/26

TEMPO DNG ZONE 4 ESTABLISHED WI THE FLW COORD DUE TO THE LAUNCHING
   OF GSLV-18 ROCKET FM INDIA:

   075000N0951000E - 093500N0951000E - 093500N0960500E -
   075000N0960500E - 075000N0951000E

   NO FLT PERMITTED OVER AND NEAR THE DNG ZONE.

   ATS ROUTE AFFECTED IN KUALA LUMPUR FIR AS FLW:
   1. P628 BTN IGREX AND MAPSO
   2. L510 BTN EMRAN AND LEKIR
   3. L645 BTN SAMAK AND SAPAM

   RMK: THE LAUNCH WILL BE ON ANY ONE OF THE DAY DRG THIS PERIOD.
   ACTUAL DATE OF LAUNCH WILL BE INTIMATED 24 HRS IN ADVANCE
   THROUGH A SEPARATE NOTAM PUBLICATION BY VOMF. SFC - UNL, 1700-2100, 30
OCT 17:00 2026 UNTIL 11 NOV 21:00 2026. CREATED: 26 OCT 07:32 2026

r/ISRO • • 5d ago

Tender for Manufacturing, Supply and Erection of SC120 Umbilical Retraction System Mast Structure

11 Upvotes

Manufacturing, Supply and Erection of SC120 Retraction System Mast Structure

Main Document [PDF] [Archived]

https://i.imgur.com/N7lePTo.png

Technical Specification : [PDF] [Archived]

Fabrication Drawings : [PDF] [Archived]

The scope of work covers procurement of raw materials including bought out items, fabrication, bending of plates, stress relieving/heat treatment, machining, drilling and tapping operations, protecting the holes/machined surfaces with lubricating grease& anti rust compound like Japan black/bituminous black compound etc., shop floor inspection, transportation to SDSC SHAR site, erection and commissioning of SC120 Retraction system mast structures on MLP according to drawings, specifications, terms and conditions at Second Launch Pad, SDSC SHAR, Sriharikota.


r/ISRO • • 4d ago

How is the work in isro for mechanical engineers

3 Upvotes

Recently I got selected for isro, so iwant to know whether surrogate modelling like work would be available there


r/ISRO • • 5d ago

What happens after Selection - Isro scientist Sc

6 Upvotes

Hi guys, my Friend got selected as scientist yesterday (mechanical)

What are the procedures and communication he is expected to do? When is joining likely to be Etc

Kindly guide him


r/ISRO • • 6d ago

ISRO might launch much-delayed indigenous navigation satellite NVS-03 on Oct 30.

Thumbnail
indianexpress.com
43 Upvotes

r/ISRO • • 6d ago

Docking test delays risk mission timeline

Thumbnail
newindianexpress.com
24 Upvotes

r/ISRO • • 6d ago

Official IN-SPACe Seed Fund Scheme : Result for Announcement of Opportunities in AI INSPIRED Opportunities in Space Sector

Thumbnail inspace.gov.in
11 Upvotes

r/ISRO • • 8d ago

L110 D-Stage Short Duration Hot Test at LPSC Mahendragiri on 24 February 2010

Enable HLS to view with audio, or disable this notification

116 Upvotes

r/ISRO • • 8d ago

A talk on 'New Trends and Innovations in Microwave Remote Sensing and Other Space Technology Frontiers' by Nilesh M. Desai

18 Upvotes

35th Vikram Sarabhai Memorial Lecture 2026

A talk on 'New Trends and Innovations in Microwave Remote Sensing and Other Space Technology Frontiers' by Nilesh M. Desai, Vikram Sarabhai Professor/Scientist and Former Director Space Applications Centre (SAC), Ahmedabad

https://www.youtube.com/watch?v=hHzrYDXc8qY&t=6998s

Few slides from this talk.

  • At 2:19:30, He talks about how they had planned 'tandem experiments' using EOS-09 (aka RISAT-1B) along EOS-04 (aka RISAT-1A) but unfortunately the EOS-09 launch failed. (With 'Tandem experiment' they might mean using one satellite as transmitter and other as receiver.)

  • At 2:32:50, Seven more SAR satellites for strategic use are planned under SBS-3 project, currently three such satellites are operational i.e RISAT-2B, RISAT-2BR1, EOS-01 (aka RISAT-2BR2).

  • At 2:33:46, Working on compact MicroSat SAR

    • 3m deployable reflector
    • Resolution : 1m to 3m (at 10 km swath), 1m (5km spot)
    • Video SAR Imaging Mode: Utilizing platform agility, extended duration Spotlight can be performed. By generating multiple frames of the SPOT image, unique Video of SAR images can be developed which will allow Moving target identification with both Speed and Direction information.
  • At 2:34:20, Working on Very High Resolution SAR (VHR-SAR)

    • Resolution : 15 cm (at 5 km swath)
  • At 2:34:40, Working on Multi-static SAR, Tomo SAR, Mirror SAR, GEO SAR concepts

  • At 2:39:15, Navigation Doppler Radar (NDR) for Lunar Polar Exploration (LuPEx) mission for 3-axis velocity determination for 10 meter accuracy in landing.

  • At 2:40:20, microwave payloads for Venus Orbiter Mission (VOM)

    • S band SAR (30m resolution with 30 km swath)
    • Orbital GPR (Depth of penetration: ~1 km, Vertical resolution: 5-15 m)
  • Impulse GPR :Precursor to LuPEx GPR

  • At 2:43:45, Tera Hz Telescope.

  • At 2:45:05, GNSS reflectometry : Demonstrated on EOS-08 (aka Microsat-2C) perhaps SpaDEx-3 will also carry a payload

  • At 2:48:00, QuTDS on TDS-01 (planned for Nov/Dec launch) will be tested at GEO altitude.

  • At 2:49:50, two LEO based SAQTI satellites SAQTI-1A/SAQTI-1B along GEO based TDS-01 will be used for Opto-Quantum communication demonstration.

  • At 2:51:10, ISRO's proposal for 140 sat constellation for LEO (1200 km) based broadband communication.

  • At 2:52:56, Proposal of 119 EO satellites between 2025-2040 has been laid out.


r/ISRO • • 8d ago

Results from India’s Chandrayaan 3 thermal probe experiment benefit future Moon missions eyeing water

Thumbnail jatan.space
29 Upvotes

r/ISRO • • 11d ago

Is the CM/SM umbilical attachment jettisoned separately before reentry?

Enable HLS to view with audio, or disable this notification

67 Upvotes

I thought during separation it would disconnect from CM like a flap while remaining attached to SM. But here we see it detaches from SM and remains attached to CM and would have to be jettisoned separately before reentry..


r/ISRO • • 10d ago

How to buy high resolution satellite images from Bhoonidhi?

15 Upvotes

I needed couple of high resolution satellite images for couple of sq kilometres in Himachal Pradesh. While researching I found about Bhoonidhi. But when I go to their site, it seems to be down. Does anyone know how one can we buy images from Bhoonidhi? Is it even possible?


r/ISRO • • 11d ago

Assembly and Integration Activities at ISRO Propulsion Complex (IPRC) Mahendragiri

Enable HLS to view with audio, or disable this notification

114 Upvotes